Well, the next phase of building constructions is underway with an expansion in a 10x14ft space. Track has been put down to experiment with locations and to start to plan grades of the track. At least trains are running again. This gives a straight run of about 35'.
Phase 3 will include the extension of the upper 57" high level above this new section.