Kanada Rail

Friday, 6 December 2013

Phase 2 expansion begins

Well, the next phase of building constructions is underway with an expansion in a 10x14ft space.  Track has been put down to experiment with locations and to start to plan grades of the track.  At least trains are running again.  This gives a straight run of about 35'.

Phase 3 will include the extension of the upper 57" high level above this new section.