Kanada Rail

Saturday, 6 December 2014

An assortment of new pictures


 Been a while since I updated some projects.


Here is a new mountain and coaling tower




Engine servicing yard.  This was the only section of the new 35 ft x 10 ft layout that was a reuse from the previous layout.





An aerial view of the layout.

I am not able to get the entire layout in one picture, perhaps a panorama is in order soon.  I will have to experiment.

Any who.............................


The North end of the layout still with lots of roughed in terrain and a future town site being thought out in the upper left.  A dock area is being planned below the new town.   From the camera to the far wall is about 18ft.  Another freight train on the upper double track is on the right.  There is a factory to be placed in the exposed wood area in the center of the picture soon.

All loops for the lower and upper tracks, as well as storage sidings, are located in an ex-closet on the left where the tracks disappear into the wall.





Construction equipment working on the soon to be marsh land area in the center section, looking North.



 
This is the middle section  looking south.  Hey the Hotel has a new pool !    From where this shot is taken the far wall with the clouds is about 18ft away.



A closer view of the town.  Looks like someone is getting busted by the cops and his dog in front of Bacon World.     Godzilla is back on the roof of Talbot's toys.






Another view of the South end with engine yard on the left and freight yard on the right. Another look at the upper double tracks too.  This section is about 10ft x 10ft.       The blue backdrop on the lower left and right has been replaced so the only clouds remaining are on the south wall.





Bye for now